Dump Hopper By-Pass Chute

Several Hunter Valley coal mines, are benefitting from less wear and fewer breakdowns because of practical individualised designs. This dump hopper by-pass chute was re-designed, engineered and manufactured for a Hunter Valley mine site. The design, modelling, drafting and engineering was completed by Telford Engineering Services and Chute Technology and working closely with TW Woods, who completed the manufacture, fabrication, abrasive blasting and industrial painting of the dump hopper by-pass chute. The completion of this project has meant that the mine site is now able to achieve maximum efficiency and productivity.

 

TW Woods, has been able to help many mine sites in NSW by supplying them with a solution to problems that they may face with their site installations not working to their full potential.

ClientN/ALocationHunter ValleyServiceBlasting & PaintingYear2022Share