Assembly of 24m Wharf Piles for Sydney Metro
Assembly of 24m Wharf Piles for Sydney Metro
featured-image

Wharf Pile fabrication by TW Woods for Waterway Constructions.

TW Woods were engaged by Waterway Construction to undertake the assembly of five 24m long wharf piles, each weighing 15 Tonnes each. Involved in the assembly of the wharf piles, was splicing assembly of pile sections, NDE, as well as the supply and fitting of pile drive flanges and welding of Tungsten Cutting Teeth.

 

 

 

 

 

 

Welding of the Tungsten Teeth onto the bottom of the 24m long wharf piles

The many parts of the 24m long wharf piles ready to be assembled

Cranes loading the massive 24m long wharf piles onto the truck ready to be delivered to Sydney Harbour