200 tonne stonedust silo manufactured by TW Woods for Grosvenor Mine

Case Study: 200-Tonne Stonedust Silo for Grosvenor Mine

Case Study: 200-Tonne Stonedust Silo for Grosvenor Mine Project Overview Client: Strata Products Australia Pty Ltd Project: Manufacture of a 200-Tonne Stonedust Silo for Grosvenor Mine   Client Requirements & Scope of Work Strata Products Australia engaged TW Woods to manufacture a 200-tonne stonedust silo for use at Grosvenor Mine. The project required heavy fabrication expertise, stringent…

Read More

Refurbished Lifting Beams for Wind Farm Construction

Project Overview TW Woods was engaged to refurbish and recertify two 110-tonne C-frame lifting beams used for wind turbine blade handling during wind farm construction. This project called for precise weld repairs, surface reconditioning, non-destructive testing, and full recertification demonstrating TW Woods’ capabilities in tackling complex, safety-critical infrastructure with confidence. Client Requirements & Scope of…

Read More

We can do that

T.W. Woods Construction ©. All Rights Reserved. 2025.