Skip to content Skip to footer

Seabourne Quest Lifting Frame Project | TW Woods

TW Woods is proud to announce the successful fabrication and deployment of a lifting frame and rotor extension for the Seabourne Quest, a critical project delivered under tight time constraints.

With the vessel at sea, the project required completion within a strict two-week window to ensure delivery before the ship’s scheduled departure from the Port of Melbourne. The lifting frame was erected and successfully used at sea, playing a key role in the disassembly of the DG1 Generator.

This included:

– Retracting a 11-ton rotor

– Flipping over a 16-ton stator

 Engineering Excellence & Precision Fabrication 

TW Woods undertook the project with a focus on structural integrity, durability, and precision engineering.

The scope of work included:

✔ Meeting AS1554.1SP welding standards

✔ Surface protection with Intergard 251 & Interthane 990 coatings

✔ Heavy-duty fasteners and high-precision fabrication

This project is a great example of TW Woods’ capability in delivering high-quality, large-scale fabrication solutions under demanding conditions.

For more information on our engineering and fabrication expertise, contact us today.

We can do that

T.W. Woods Construction ©. All Rights Reserved. 2025.